Wellsite Facility Emissions Evaluation

Tegre completed site evaluation and mitigation solutions for multiple facilities. A multi-disciplinary team reviewed operational data, observed the site, gathered input from operations, and performed process simulations in order to propose three levels of possible intervention with Level 1 being the lowest cost, Level 3 being the highest. This multi-disciplinary team worked with the client…

survey

Pipeline & Gathering System Survey

Tegre was tasked to complete an impact study for an existing gathering system and pipeline corridor.  Scope included surveying power lines running parallel and crossing the corridor, road crossings, major drainages, structures inside the corridor and minimal distance outside, exposed lines, and major natural formations.  Deliverables includes drawings and shape files.

Survey, Line Locates & Mapping

Tegre recently completed a large-scale line locate project in the San Juan basin.  Scope included locating and surveying of existing pipelines, valves, tees, risers, terminations, and potential pig points.  Exhibit deliverables included as-built maps and drawings/alignment sheets.

Field Wide Reclamation Plan

Project consisted of providing client with a reclamation plan for field wide abandonment of wells, gathering lines, pads and access roads.  Scope included as-built survey and mapping of existing facilities and above and below ground pipelines, preparation of site exhibits, field prescriptions, civil engineering/design, on-sites with local jurisdiction, final reclamation plan, and support with implementing plan.

Multi Well Pad Development and Permitting

Tegre supported a client in a new development and was responsible for permitting efforts for a multi well pad development program.  Tegre’s scope of work included site selection support, survey, regulatory support, environmental clearance, APD packages and exhibits, plats, alignment sheets, and site plans.

Phase I ESA for Potential Asset Acquisition

Tegre performed Phase I ESA including site inspection, records review and interviews, and a final report documenting methods and findings.  Completion of the ESA provided for examination of recognized environmental conditions associated with the properties, including an evaluation of the former uses, existing conditions, and potential for contaminants to migrate.

Stormwater Plans, Inspection & Monitoring

Tegre has/is supporting clients with stormwater management plans.  Scope of services includes one site review to refine locations for chosen BMPs, narrative for stormwater management plans that meet state and federal standards, BMP implementation maps (legend and materials sheet, during-construction phase sheet, and interim reclamation sheet), BMP installation detail sheets, inspection and monitoring for completion per jurisdictional requirements.

Utility Exposure Rehabilitation

A client identified a high-risk pipeline exposure within a primary channel. Non-native species growth within the channel altered low-flow dynamics within the active floodplain, forcing unusually high flows and causing long-term and on-going risk to the pipelines.  Tegre staff designed a bank reinforcement at the site of the pipe exposure, re-establishing a stable bank, and developing a channel augmentation designed to promote near pre-existing low-flow channel dynamics for long term protection.  Tegre staff joined archaeological consultants to prepare necessary environmental products to satisfy tribal regulation and to obtain United States Army Corps of Engineers project authorization under §404 of the CWA and obtain water quality certification through the Environmental Protection Agency under §401 of that Act. Tegre staff also provided on-site Environmental Inspection services during project execution to ensure compliance with all involved agency mitigations.

Field Wide Pig Trap Safety Upgrade Program

Tegre completed walk downs for a client consisting of over 150 existing pig traps – focusing on safety concerns. Tegre designers and engineers created 3D models of the existing traps and redesigned with a focus on safety upgrades. Detailed drawings and Bill of Materials of the upgrades were produced.

pipline project management

Pipeline and Gathering System Project Management & Engineering

Tegre has/is assisting clients by providing project management and engineering for pipelines projects.  Scopes include providing clients leadership and initiative to execute tasks in project planning and engineering functions including project communications and interface, constructability assessment, determination of routing, Right of Way requirements, permitting, code and pressure design, cost estimating, materials specifications, facility designs and…

Facility Modifications & Expansions

Tegre has/is supporting clients with facility modifications and expansions.  Facilities include compressor stations, cryo plants, SWDs, terminals, well pads, and pump stations.  Scope of services include engineering, design, regulatory and permitting.  Modifications and expansions include slug catcher and Flare Knock-Out Vessel upgrades, stabilizer additions, tank battery additions, PLC upgrades, separator additions, meter additions, LACT additions.

Turnkey PLCs

Tegre has/is providing Turn Key PLC panel solutions for multiple clients.  Scope of services include providing I/O lists, layout drawings, wiring diagrams and plc specifications.  Complete interface to field devices and instrumentation including conduit/cable sizing and schedules, voltage drop calculations, equipment location drawings, conduit routing plans and cable tray design.  Tegre supplies, inspects, and coordinates…

engineers in field

Owners Engineer

Tegre currently supports clients with full-time selected engineering staff located in client office.  Project engineering tasks include:

Assisting with development, engineering, construction, operations, and maintenance teams to ensure operations and expense projects are managed within budget and on time per the execution schedule.
Provide project engineering and design support for multiple projects executed simultaneously.
Conceptual engineering, project scope, estimate, schedule, engineering design, equipment and material selection, project bidding, contractor selection, construction support, management of change, safety and environmental participation.
Identify support teams, and act as liaison between client office and Tegre office for execution of projects and operations support in a safe, efficient, and timely manner.
Preparation of engineering deliverable to support operations and maintenance activities, including drawings, analyses, plans.
Assist with engineering and project management activities such as cost estimating and procurement

Electrical worker in protective gear

ARC Flash Studies

Electrical system analysis and studies, including new and existing facilities.  Scope of services include creating one-line diagrams, short circuit analysis, protective device coordination, arc flash hazard analysis, review and update of existing studies to reflect system changes, review and design of system modifications to minimize electrical hazards, documentation of study results on one-line diagrams and…

EI&C Facility Upgrades

Tegre has/is supporting multiple clients with EI&C facility upgrades.  Scope of services include PLC upgrade and replacement, I/O list development based on existing station and ESD programs, supply of junction boxes with connection diagrams and BOMs, equipment inspection, conduit and cable schedules, plan drawings, record drawings for ESD system, shutdown cause and effect diagrams, and…

SWD Facilities

Tegre is assisting clients in multiple oil and gas plays with Engineering and Design of salt water disposal facilities.  Scopes include FWKO details for fabrication, Civil, Structural, Mechanical, Process, Electrical and Instrumentation.  Tegre provides Mechanical and EI&C construction drawing packages consisting of: P&IDs, Plot Plans, Piping and Equipment Layout, Piping Isometrics, Structural Support Details, Foundation…

Closed Vent System Assessments

Tegre walked down and documented LP Closed Vent System configurations for 50 newly acquired well sites in the Permian Basin, and 10 San Juan Basin sites for Producer Client.  Tegre utilized flash, working and standing vent gas calculations to evaluate piping hydraulics and control device capacities (VRUs/Combustors/Flares) for compliance with OOOOa.

Multi-Well Pad Engineering & Design

Tegre is assisting clients in multiple oil and gas plays with Engineering and Design of Production Facilities on multi-well pads.  Scopes include Civil, Structural, Mechanical, Process, Electrical and Instrumentation.  Tegre provides Mechanical construction drawing packages consisting of: P&IDs, Plot Plans, Piping and Equipment Layout, Piping Isometrics, Structural Support Details, Foundation location Plans, Bill of Materials. …

bayfield bridge survey project

Bayfield Twin Bridges

The construction surveying included; slope staking, finish grading, bridges, bike paths, sewer manholes and all the infrastructure on the roadway (guardrails, signs, striping, rip-rap, and fencing).

survey project three springs

Three Springs Phase II

Tegre completed this project from the ground-up: mass grading, slope staking, curb and gutter, sidewalk, and all utilities.

Mercy Regional Hospice project

Mercy Regional Hospice

This is a project Tegre did from the ground-up: staking, overall grading, curb and gutter, parking, sidewalk and building.

Centralized Gas Lift Facility Mechanical Design

Tegre assisted Client with standardizing and streamlining the construction process for centralized gas-lift facilities in the Permian Basin. Tegre completed Isometric,facility layout and Foundation Plan drawings with a complete Bill of Materials for a standard facility design. This allowed optimized spacing for future expansion, prefabrication of large welded piping assemblies, and accurate and orderly bidding and construction processes. Tegre conducted design walk-throughs with Facilities Engineering, Construction, and Operations staff to include features needed by all stakeholders, and a well running facility.

Shale Gas Summary Report

Report included: Summary and history of shale gas in the US, overview of US network, typical gas properties and technical analysis, lessons learned, and best practices.

LACT unit installation

LACT Units

Client had a very short time frame to complete installation of a total of 9 LACT units for truck crude oil unloading at 4 separate terminals. Project consisted of civil, mechanical, piping, and electrical aspects. All 4 sites were built concurrently. Tegre had responsibility for design, engineering, procurement support, and project management. Project was completed ahead of schedule and on budget.

crude oil measurement facility design

Crude Oil Meter Stations

Engineered and designed two 7,000 bph measurement facilities. Tegre supported the client with P&IDs, site and piping layout, foundation and grading designs, minor equipment/material/instrument procurement packages, full electrical engineering and design, construction bid documentation, RFI support, and vendor coordination.