Tegre was engaged to provide engineering, design, procurement and construction support for a grassroots enhanced oil recovery (EOR) project in central Wyoming. The project targets a large COâ‚‚ reservoir within a mature oil field that has been under waterflood since the late 1950’s. As part of the next phase of field development, a COâ‚‚ flood is being implemented to maximize recovery of remaining hydrocarbons in an economically efficient manner.

Tegre’s scope includes full engineering, design, procurement, project management and construction services for the development of key surface facilities, including:

  • Production Gathering System: Pipeline network connecting producing wells to the central production facility.

  • Central Production Facility: Infrastructure for fluid testing, separation, processing, and storage.

  • Re-injection Facility: Pumping and compression systems to condition water and COâ‚‚ for reinjection.

  • Injection Distribution System: Pipeline network distributing water and COâ‚‚ across the field for reservoir injection.

This project highlights Tegre’s capability to deliver integrated EOR infrastructure solutions that extend field life and enhance long-term asset value.