Tegre was tasked to complete an impact study for an existing gathering system and pipeline corridor.  Scope included surveying power lines running parallel and crossing the corridor, road crossings, major drainages, structures inside the corridor and minimal distance outside, exposed lines, and major natural formations.  Deliverables includes drawings and shape files.