Field Wide Reclamation Plan

Project consisted of providing client with a reclamation plan for field wide abandonment of wells, gathering lines, pads and access roads.  Scope included as-built survey and mapping of existing facilities and above and below ground pipelines, preparation of site exhibits, field prescriptions, civil engineering/design, on-sites with local jurisdiction, final reclamation plan, and support with implementing plan.

Pipeline and Gathering System Project Management & Engineering

Tegre has/is assisting clients by providing project management and engineering for pipelines projects.  Scopes include providing clients leadership and initiative to execute tasks in project planning and engineering functions including project communications and interface, constructability assessment, determination of routing, Right of Way requirements, permitting, code and pressure design, cost estimating, materials specifications, facility designs and…

Turnkey PLCs

Tegre has/is providing Turn Key PLC panel solutions for multiple clients.  Scope of services include providing I/O lists, layout drawings, wiring diagrams and plc specifications.  Complete interface to field devices and instrumentation including conduit/cable sizing and schedules, voltage drop calculations, equipment location drawings, conduit routing plans and cable tray design.  Tegre supplies, inspects, and coordinates…

Owners Engineer

Tegre currently supports clients with full-time selected engineering staff located in client office.  Project engineering tasks include:

Assisting with development, engineering, construction, operations, and maintenance teams to ensure operations and expense projects are managed within budget and on time per the execution schedule.
Provide project engineering and design support for multiple projects executed simultaneously.
Conceptual engineering, project scope, estimate, schedule, engineering design, equipment and material selection, project bidding, contractor selection, construction support, management of change, safety and environmental participation.
Identify support teams, and act as liaison between client office and Tegre office for execution of projects and operations support in a safe, efficient, and timely manner.
Preparation of engineering deliverable to support operations and maintenance activities, including drawings, analyses, plans.
Assist with engineering and project management activities such as cost estimating and procurement

SWD Facilities

Tegre is assisting clients in multiple oil and gas plays with Engineering and Design of salt water disposal facilities.  Scopes include FWKO details for fabrication, Civil, Structural, Mechanical, Process, Electrical and Instrumentation.  Tegre provides Mechanical and EI&C construction drawing packages consisting of: P&IDs, Plot Plans, Piping and Equipment Layout, Piping Isometrics, Structural Support Details, Foundation…

Multi-Well Pad Engineering & Design

Tegre is assisting clients in multiple oil and gas plays with Engineering and Design of Production Facilities on multi-well pads.  Scopes include Civil, Structural, Mechanical, Process, Electrical and Instrumentation.  Tegre provides Mechanical construction drawing packages consisting of: P&IDs, Plot Plans, Piping and Equipment Layout, Piping Isometrics, Structural Support Details, Foundation location Plans, Bill of Materials. …

Centralized Gas Lift Facility Mechanical Design

Tegre assisted Client with standardizing and streamlining the construction process for centralized gas-lift facilities in the Permian Basin. Tegre completed Isometric,facility layout and Foundation Plan drawings with a complete Bill of Materials for a standard facility design. This allowed optimized spacing for future expansion, prefabrication of large welded piping assemblies, and accurate and orderly bidding and construction processes. Tegre conducted design walk-throughs with Facilities Engineering, Construction, and Operations staff to include features needed by all stakeholders, and a well running facility.

LACT Units

Client had a very short time frame to complete installation of a total of 9 LACT units for truck crude oil unloading at 4 separate terminals. Project consisted of civil, mechanical, piping, and electrical aspects. All 4 sites were built concurrently. Tegre had responsibility for design, engineering, procurement support, and project management. Project was completed ahead of schedule and on budget.